BFRM
Laboratory
To meet our quality policy with the expectations and needs of our clients we have experience and professional laboratory staff (engineers and technicians) and tested equipment’s which calibrated on a regular basis by following the national and international standards, with high quality controlled procedure in accordance to international classification. Aggregate materials and fresh concrete were tested and checked daily, weekly and monthly as sieve analysis, specific gravity, elongation, flakiness, concrete work-ability, concrete strength, trial mixes, etc. according to the international specifications (BS/BSEN and/or ASTM) or any projects specification.
Laboratory Equipments
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Quality Control Program
Cement
No.
|
Test Description
|
Standard
|
Frequenc
-
Batch Lab |
Frequency -
Independent Lab |
1. |
Fineness Test (Blain Test) / (Air Permeability Test) |
AS TM C 150:2000 / BSEN 196-6:1992 |
Daily |
- |
2. |
Initial &Final Setting of Cement |
ASTM C 191:2007 / BSEN 196-3:2005 |
Weekly |
When Required |
3. |
Compressive Strength |
BSEN 196-1:2005 / ASTM C-109:2007 |
Monthly |
When Required |
4. |
Physical & Chemical Analysis |
BS 4550 Part3, Sec.3.1:78 |
- |
When Required |
Aggregates
No.
|
Test Description
|
Standard
|
Frequenc
-
Batch Lab |
Frequency -
Independent Lab |
1. |
Particle Density &water Absorption |
ASTM -127 -15C/S -8 COARSE & ASTM -128 -15C/S -8 FINE |
Weekly |
Every 6 Months |
2. |
Flakiness Index BSEN 933-3:1997 |
- |
Weekly |
Every 6 Months |
3. |
Elongation Index |
BS 812:Part 105.2:1989.7 |
Weekly |
Every 6 Months |
4. |
Bulk Density [Un-rodded] |
- |
Weekly |
When Required |
5. |
Sieve Analysis superseded by BSEN 933-1:1997 |
BS 812:Part 103.1:1985 C/S 7.2 |
Daily |
Every 6 Months |
6. |
Moisture Content |
BS EN 812-PART109-1990 |
Daily |
When Required |
7. |
Material Finer Than # 200 Sieve superseded by BSEN 933-1:1997 |
ASTM C117-2013 C/S 8 |
Daily |
Every 6 Months |
Concrete Water
No.
|
Test Description
|
Standard
|
Frequenc
-
Batch Lab |
Frequency -
Independent Lab |
1. |
Temperature Checking |
- |
Every 3 Hour |
- |
2. |
Chemical Test Of Water |
BS 3148 : 1980 |
- |
Every 6 Months |
Chemicals Additives (Admixture)
No.
|
Test Description
|
Standard
|
Frequenc
-
Batch Lab |
Frequency -
Independent Lab |
1. |
Density |
- |
Per Load |
Every 6 Months |
2. |
Solid Content |
ASTM C494:2017 |
Per Load |
Every 6 Months |
3. |
Temperature |
ASTM C494 |
Per Load |
As per client requirements |
4. |
Appearance |
- |
Per Load |
As per client requirements |
Fresh Concrete
No.
|
Test Description
|
Standard
|
Frequenc
-
Batch Lab |
Frequency -
Independent Lab |
1. |
Control Mix |
- |
Weekly |
As Per Client Requirement |
2. |
Sampling of fresh Concrete |
BS EN 12350-1 :2000 |
Daily |
As Per Client Requirement |
3. |
Temperature Checking |
BS 5328 section 2,3,4 |
Daily |
As Per Client Requirement |
4. |
Slump Test |
BS EN 12350-2 :2000 & ASTM C143 |
Daily |
As Per Client Requirement |
5. |
Density of Fresh Concrete |
BS EN 12350-6 :2000 |
Daily |
As Per Client Requirement |
6. |
Air Content of Fresh Concrete |
BS EN 12350-7 :2000 / ASTM C231 - 2006 |
Weekly |
As Per Client Requirement |
Hard Concrete
No.
|
Test Description
|
Standard
|
Frequenc
-
Batch Lab |
Frequency -
Independent Lab |
1. |
Making & Curing Cubes for strength Test |
BS EN 12390-2:2000 |
Daily |
As Per Client Requirement |
2. |
Compressive Strength of Test Cubes |
BS EN 12390-3 :2002 |
Daily |
As Per Client Requirement |
3. |
Cube Sampling Method |
BS1881-Part 101-1983 |
Daily |
As Per Client Requirement |
4. |
Cube Crushing Storage Method |
BS1881-Part 111-2009 |
Daily |
As Per Client Requirement |
5. |
Chloride Migration Test |
NT BUID 492-1999-11 C/S 6.4 |
Daily |
As Per Client Requirement |
6. |
Water Permobility |
DIN-1048 Part5:1991 |
Daily |
As Per Client Requirement |
7. |
Initial Surface Absorption |
BS 881 Part 208-1996 C/S 8.1.3 |
Daily |
As Per Client Requirement |